75,000 TPY copper-gold concentrate processing site in Sanmenxia

Capacity: 75,000 TPY

Materials: Gold Concentrate

Project Location: Sanmenxia

Main equipment: Flotation machines, thickeners, leaching tanks, electrolytic cells, etc. 
Product Details
Located in Sanmenxia, this integrated copper-gold concentrate recovery system has been operating stably for nearly 20 years, processing approximately 75,000 metric tons of copper-gold concentrate annually. Its many years of continuous operation are underpinned by a combination of a proven process and a stable management and control system.
 

 

Process:

This project uses gold concentrate as raw material and employs a slurry-feeding process, in which the ground ore slurry is fed directly into a fluidized-bed roaster for acid roasting. This thoroughly breaks down the sulfide coating, fully exposing the gold particles.




Copper is extracted from the roasted ore through an acid leaching process, and then national standard electrolytic copper is produced via an extraction-electrolysis process, simultaneously recovering associated copper resources.




The leach residue from the acid leaching process is sent to the cyanidation stage, where gold and silver are dissolved through cyanide leaching. Zinc powder is then used to replace the metals, yielding gold sludge, which is finally refined by electrolysis and cast into gold ingots.



 

Control System:

The core production processes are integrated with a smelting production control system, which uses intelligent control algorithms to enable automated closed-loop management of the “metal flow” and automatically adjusts equipment operation and process parameters based on real-time operating conditions.




Feedback:

The client praised the project for delivering on its promises. The unprecedented "Hongji Speed" saved valuable time, while the holistic problem-solving approach directly boosted economic viability. By seamlessly integrating mining, processing, and tailings management under one roof, the EPC+M+O model eliminated vendor friction. The client affirmed that this project is a strategic milestone, proving that modern, green, and efficient mining is highly viable in Zimbabwe.



  
Service support:



- 48-hour idling test machine before leaving the factory.

- You can take the materials to the factory test machine.

- We will customize the solution according to your needs.
yuanli
Inquiry
Please feel free to submit your inquiry information to us. We will contact with you as soon as possible.
Whatsapp
Tel
Message Top